Modular Intelligent Prefabricated Cabin
Operating environment
▪ Ambient temperature range: -40°C to +85°C;
▪ Installation location: outdoor;
▪ Altitude generally does not exceed 3,000 m;
▪ Soil resistance class: Class II;
▪ Outdoor wind speed does not exceed 35 m/s;
▪ Seismic resistance: horizontal acceleration of 0.3 m/s²;
▪ Vertical acceleration shall not exceed 0.15 m/s²;
▪ When operating conditions exceed the aforementioned normal environmental specifications, our company can provide customized design solutions tailored to the user’s specific requirements.
Product Features
|
▪ Land area Approximately 2,000 square meters |
▪ Construction Period The entire system is pre-assembled as a complete unit; all equipment is factory‑prefabricated and ready for on‑site installation, resulting in a short construction period of 1–2 months. |
▪ Cable usage The equipment is highly integrated, with reduced electrical distances, enabling approximately 30% cable savings. |
▪ Environmental Requirements It features an all-metal enclosure, an IP54 protection rating, and a comprehensive HVAC system that safeguards against windblown sand and condensation, thereby enhancing equipment reliability. |
▪ Construction and Management Costs Prefabricated design eliminates on-site construction, resulting in lower construction costs; all equipment is supplied by our company, which also handles all installation and commissioning, thereby reducing management expenses. |
▪ Operations and maintenance costs Closed-loop design, largely unaffected by environmental and other external factors, with low operation and maintenance costs. |
Special Use Environment
|
▪ Operations and maintenance costs Closed-loop design, largely unaffected by environmental and other external factors, with low operation and maintenance costs. |
▪ Hot regions Cabin thermal insulation performance Energy-Efficient Design of Refrigeration Equipment |
▪ High-altitude areas On-site construction personnel screening Precautions for On-Site Operations |
▪ High-altitude cold regions Cabin thermal insulation performance Cabin Material Selection Auxiliary heating equipment Performance Design/Calculation |
▪ Highly corrosive areas Customized cabin coating process Customized cabin sealing performance |
Previous page
Next page
Previous page
Next page
Recommended Products
Leave a Message Online
If you have any suggestions, please leave a message or email us. We will reply within one business day of receiving your message.